Brief from Client

To cover an area of hard standing outside the existing warehouse to allow the loading and unloading of trucks to take place under cover thus freeing up additional storage space in the warehouse. Without adversely disrupting the day to day operations of a busy distribution hub during the 7 day build.

Bees Structure Solution

Bees Structures delivered a 20m x 60m structure with a 6m side height allowing loading and unloading to take place under cover. We worked very closely with the client to ensure that during the 7 day build, access to the warehouse was maintained, despite the structure being built over the main access to the warehouse.

case-study-1 case-study-2